Technical Application Data

Primer 5000 may be applied within temperature ranges from 50°F to 100°F. This primer has a max working time window of 24 hours. Re-coat will be necessary if the 24 hr drying window is exceeded. Proper application time is when the primer begins to become tacky to the touch which is dependent on humidity. A catalyst may be added to decrease dry time if working in humid conditions. Levels of 0.1 to 1% can reduce the drying time to 10 min if necessary. Topcoats are applied immediately to tacky surface. If primer becomes totally dry, then re-coat. Application of primer may be airless sprayer, brush or roller. Recommended wet film thickness is 5-10 mils. Material coverage per mixed gal 250 sq.ft/ gal. depending on roughness of surface and application method. Always wear protected respiratory and eye protection when using.

Physical Properties

Primer 5000 Physical Properties
Salt Water Spray ASTM B117 Pass 500 hours
Cathodic Protection ASTM C876 Pass 75°C
Elongation ASTM D412 150%
Viscosiy ASTM 522 600 cp
Flash Point Pensky-Marten 460°F
Appearance Visual Amber Liquid
Application Timing Touch *Dependent on humidity, see Application Data below*

Adhesion Results

Adhesion Results of Typical Substrates per ASTM D-4541 Elcometer

Concrete >250 psi Excellent bonding
Steel >250 psi Excellent bonding
Wood >250 psi Excellent bonding
EPDM/PVC Membrane >250 psi Excellent bonding

Substrate Surface Preparation

As always, preparation of substrate surface prior to the application of any SuperSkinSystem material as it is extremely important to achieve proper bonding of the total system.
Concrete must be fully cured and should be cleaned with a high pressure steam cleaner combined with an alkaline detergent wash solution or secured with a sandblasting or shot-blasting procedure depending on the severity of the concrete surface condition. After surface cleaning a thorough rinsing procedure must be completed to remove residual cleaning agents. Power blow drying then natural evaporative air drying is usually a sound procedure to eliminate moisture. For patching, use our calcium carbonate filled fast-set Acrylic Modified Epoxy applied by trowel. For expansion joints, use our Joist Seal applied by hand cartridge dispensing gun. Metals must be prepared and standardly prepped to be clean and free of contaminants.

This technical data information is accurate to the best of our knowledge. SuperSkinSystems™ Inc. makes no warranty, expressed or implied within the materials on this website, its use or with its any application. SuperSkinSystems™ Inc. shall not be liable for material or application related injuries, material non-conformance, application failures or any consequential damage by the use of this product.